Uploaded image for project: 'eZ Platform Enterprise Edition'
  1. eZ Platform Enterprise Edition
  2. EZEE-753

Overflow target schedule block changes depend on position of slider on timeline in source block

    XMLWordPrintable

Details

    • Icon: Bug Bug
    • Resolution: Won't Fix
    • Icon: High High
    • None
    • None
    • Studio UI

    Description

      Overflow target schedule block changes depend on the position of the slider on the timeline in the source schedule block.

      Steps:
      1. Create a new LP with at least 2 zones.
      2. Add two schedule blocks, one per zone.
      3. Set overflow (from hero to grid).
      4. Add 4 content items to 1st block (hero) with ca. 2 hour gaps. Confirm overflow for items 2-4.
      5. Check the timeline for 1st block. (move the timeline slider after the last change)
      [4 changes are visible]
      6. Check the timeline for 2nd block.
      Result: 3 changes are visible. (and are shifted to the left by one EZS-752)
      7. Select 1st block, move the slider after the 3rd change.
      8. Check the timeline for 2nd block.
      Result: 2 changes are visible.
      9. Select 1st block, move the slider after the 2nd change.
      10. Check the timeline for 2nd block.
      Result: 1 change is visible.
      11. Select 1st block, move the slider after the 1st change.
      12. Check the timeline for 2nd block.
      Result: no changes are visible.

      Attachments

        Activity

          People

            Unassigned Unassigned
            michal.szoltysek@ibexa.co Michał Szołtysek
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: